Set: KStar E10KT+ Hybrid Inverter + Blue-Pack-20.4 Battery Pack + Wi-Fi Plug & CTs / CATL.
For the system to function correctly, KS_Wire_3ph cables and a KS_YDS60-80 energy meter are also required.
A comprehensive, three-phase energy storage solution: the BluE series.
The KSTAR BluE series energy storage solution is an optimal choice for residential PV+ESS (photovoltaic + energy storage system) applications. It features a 10 kW, three-phase AC output. The energy storage capacity can be configured as 10,2, 20,4, 30,6, or 40,8 kWh.
Advantages:
- High-performance LFP (lithium iron phosphate) battery from CATL.
- 20 kW PV input; 10 kW charging capacity and 10 kW AC output.
- Modular design: the energy storage system can be expanded using multiple 5,12 kWh units.
- 10 kW, three-phase backup output with a grid-to-off-grid switching time of less than 20 ms
- EMS (Energy Management System) included; suitable for a variety of applications.
Hybrid systems offer numerous benefits:
- 1.Energy self-sufficiency: With a hybrid system, you can generate your own electricity using photovoltaic panels and store it in a battery. This reduces your reliance on grid energy suppliers.
- 2.Savings on utility bills: By using solar energy, you reduce your electricity bills. During the day, solar panels generate energy, and any excess is stored in a battery. In the evening or at night, you can use this stored energy.
- 3.Eco-friendliness: Using solar energy is environmentally friendly. It produces no harmful greenhouse gas emissions or other pollutants.
- 4.Backup power during outages: In the event of a grid power failure, a hybrid system can serve as a backup power source. The battery allows you to continue using electricity even when there is no access to the grid.
- 5.Smart energy management: Hybrid systems often feature advanced energy management systems. They can optimize energy consumption, charge the battery during off-peak (cheaper) hours, and adapt to your lifestyle.
Keep in mind that the choice of a hybrid system depends on your individual needs and specific circumstances. It is always a good idea to consult with a solar energy professional before making a purchase.
The price does not include an electricity meter. A meter is required if the distance between the installation site and the distribution board exceeds 20 meters.